Planned power outage to affect multiple buildings on Monday, Oct. 14
This outage is being scheduled to allow for the replacement of two (2) main power building distribution switches and a concurrent elevation of those switches to an above-ground location out of their existing underground locations. These switch relocations are being undertaken to improve switch reliability and serviceability in a dry above-ground environment, away from wet, underground conditions that have been detrimental to our campus power distribution systems.