Construction of an exterior concrete ADA ramp at the southwest corner of the Geology Building and east of the RSC, will begin today (Monday, June 20) and is projected to be completed on or before Friday, Aug. 5. The exit door from Geology Lecture Hall 101 will be closed for use, except that it can be used for exiting in case of emergency. The door will be labeled as such on the inside during construction.