Preliminary test of fire systems in Wallace Hall, Engineering Building
August 10, 2017
Preliminary test of fire systems in Wallace Hall, Engineering Building
There will be a preliminary test of the fire systems in Wallace Hall and Engineering Building as a part of the remodels in those buildings. The test will take place 7-9 a.m. today (Friday, Aug. 11).