LeadershipInnovation at WSUResearchDirectoriesGive to WSUmyWSUOneStop
ACADEMICSADMISSIONSSTUDENT LIFEATHLETICSABOUTAPPLY NOW
  • Leadership
  • Innovation at WSU
  • Research
  • Directories
  • Give to WSU
  • myWSU
  • OneStop
  • Academic Calendar
  • Apply Now!
  • A-Z Directory
  • Blackboard
  • Campus Events
  • Careers and Employment
  • Office Hours
  • Policies and Procedures
  • Schedule of Courses
  • ShockerSync - Student Events
  • Shocker Store
  • Student Webmail
  • Technology HelpDesk
  • Transfer to WSU
  • University Libraries
Wichita State University LogoWichita State University Logo
ACADEMICSADMISSIONSSTUDENT LIFEATHLETICSABOUTAPPLY NOW

Search Results for “ai”

6,014 results · showing 2321–2340 · 410 ms

Search Results

  1. PDF

    5250-5-NCAMP-Process-Specification

    …5250-5. Specifically, this specification covers prepreg cutting, layup, vacuum bagging, and curing process with an autoclave, followed by a free-standing post-cure in a forcedair convection oven. This specification does not contain all the necessary information typically required in a composite process specification for the fabrication of composite…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5250-5/5250-5-NCAMP-Process-Specification.pdf

  2. PDF

    T650-6k-5HS-2

    …Number SP4613WI-Q NCAMP Test Report Number: CAM-RP-2010-076 Rev B July 27, 2012 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Northrop Grumman Corporation 700 N. Douglas St, Building 902, El Segundo, CA 90245 Page 1 of 247 NATIONAL…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5250-5/T650-6k-5HS-2.pdf

  3. PDF

    5250-5-NCAMP-Material-Base-Specification

    NMS 226 Rev A Date: August 17, 2017 Document No.: NMS 226 NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Autoclave Cure, Toughened Bismaleimide Prepregs (Cytec Cycom 5250-5) Prepared by: Yeow Ng, John Tomblin, Vinsensius Tanoto Reviewed by: Jessie MacLeod (Cytec), …

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5250-5/5250-5-NCAMP-Material-Base-Specification.pdf

  4. PDF

    T650-Unitape-2

    …NCAMP Test Report Number: CAM-RP-2010-079 Rev C Report Date: October 10, 2017 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Northrop Grumman Corporation 700 N. Douglas St Building 902 El Segundo, CA 90245 Page 1 of 265 NATIONAL…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5250-5/T650-Unitape-2.pdf

  5. PDF

    T650-6k-5HS-2

    …Number SP4612WI-Q NCAMP Test Report Number: CAM-RP-2010-056 Rev A July 27, 2012 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Cytec Engineered Materials Inc 1440 N. Kraemer Blvd Anaheim, CA 92806. Page 1 of 247 NATIONAL INSTITUTE FOR…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5215/T650-6k-5HS-2.pdf

  6. PDF

    5215-NCAMP-Material-Base-Specification

    NMS 323 Rev Date: August 14, 2017 Document No.: NMS 323 NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Low Initial Temperature Vacuum-Bag-Only Cure, Modified Epoxy Prepregs (Cytec Cycom 5215) Prepared by: Yeow Ng, John Tomblin, Vinsensius Tanoto Reviewed by: Ric…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5215/5215-NCAMP-Material-Base-Specification.pdf

  7. PDF

    T40-800-Unitape-2

    …Number SP4612WI-Q NCAMP Test Report Number: CAM-RP-2010-048 Rev N/C July 27, 2012 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Cytec Engineered Materials Inc 1440 N. Kraemer Blvd Anaheim, CA 92806. Page 1 of 258 NATIONAL INSTITUTE FOR…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5215/T40-800-Unitape-2.pdf

  8. PDF

    T650-Unitape-2

    …NCAMP Test Report Number: CAM-RP-2013-002 Rev A Report Date: January 27, 2017 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Gulfstream Aerospace Corporation 500 Gulfstream Rd. Savannah, GA 31408 Distribution Statement A. Approved for…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5320-1/T650-Unitape-2.pdf

  9. PDF

    AS4-PW-2

    NATIONAL INSTITUTE FOR AVIATION RESEARCH Wichita State University CAM-RP-2010-006 April 14, 2011 Revision N/C Hexcel 8552S AS4 Plain Weave Fabric Prepreg 193 gsm & 38% RC Qualification Material Property Data Report FAA Special Project Number SP4614WI-Q NCAMP Test Report Number: CAM-RP-2010-006 N/C April 14, 2011 Prepared by: Kristin Marlett Reviewed by:…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/hexcel-8552/AS4-PW-2.pdf

  10. PDF

    EP2202-NCAMP-Process-Specification

    NPS 82202 Rev Date: January 26, 2012 Document No.: NPS 82202, Revision -, January 26, 2012 NCAMP Process Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Fabrication of NMS 220 Qualification, Equivalency, and Acceptance Test Panels (Cytec Cycom EP 2202 prepregs) Prepared by: Amy…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-ep2202/EP2202-NCAMP-Process-Specification.pdf

  11. PDF

    T650-3k-70-PW-3

    …Institute for Aviation Research Wichita State University Wichita, KS 67260-0093 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Fabrication Facility: Spirit AeroSystems, Inc. 3801 S Oliver St Wichita, KS 67278 Distribution Statement A. Approved for public release;…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-ep2202/T650-3k-70-PW-3.pdf

  12. PDF

    IM7G-Unitape-2

    … 061101 NCAMP Test Report Number: CAM-RP-2014-017 Rev N/C Report Date: August 23, 2017 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Spirit AeroSystems, Inc. 3801 S Oliver St Wichita, KS 67278 Distribution Statement A. Approved for public release;…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-ep2202/IM7G-Unitape-2.pdf

  13. PDF

    T650-3k-70-PW-2

    …NPN061101 NCAMP Test Report Number: CAM-RP-2014-022 N/C Report Date: August 23, 2017 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Spirit AeroSystems, Inc. 3801 S Oliver St Wichita, KS 67278 Distribution Statement A. Approved for public release;…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-ep2202/T650-3k-70-PW-2.pdf

  14. PDF

    IM7G-Unitape-3

    …Institute for Aviation Research Wichita State University Wichita, KS 67260-0093 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Fabrication Facility: Spirit Aerosystems, Inc. 3801 S. Oliver St. Wichita, KS 67278 Distribution Statement A. Approved for public release;…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-ep2202/IM7G-Unitape-3.pdf

  15. PDF

    EP2202-NCAMP-Material-Base-Specification

    NMS 220 Rev Date: January 26, 2012 Document No.: NMS 220, Revision -, January 26, 2012 NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Autoclave Cure, High Toughness and High Open-Hole Compression Epoxy Prepregs (Solvay Cytec Cycom EP 2202) Prepared by: Yeow Ng,…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-ep2202/EP2202-NCAMP-Material-Base-Specification.pdf

  16. PDF

    TC250-NCAMP-Process-Specification

    …Meyers (TenCate), Yeow Ng (NCAMP), John Tomblin (NCAMP) Reviewed by: David Ostrodka National Center for Advanced Materials Performance Wichita State University – NIAR 1845 Fairmount Ave., Wichita, KS 67260-0093, USA Page 1 of 12 July 29, 2008 NPS 81688 Rev C Table of Contents 1. SCOPE…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-tc250/TC250-NCAMP-Process-Specification.pdf

  17. PDF

    12k-HTS40-2

    …NCAMP Test Report Number: CAM-RP-2011-005 Rev A Test Report Date: September 26, 2016 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Advanced Composites Technologies 345 Coney Island Dr. Sparks, NV 89431 Page 1 of 254 Report No: CAM-RP-2011-005…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-tc250/12k-HTS40-2.pdf

  18. PDF

    TC250-NCAMP-Material-Base-Specification

    …No.: NMS 688, Revision C, November 30, 2016 FAA Special Project# SP4745WI-Q NCAMP Project Number NPN4745WI-Q NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 250ºF Vacuum Cure, Epoxy Prepregs (Tencate TC 250) Prepared by: Yeow Ng, John Tomblin Reviewed by: Barry …

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-tc250/TC250-NCAMP-Material-Base-Specification.pdf

  19. PDF

    T650-Unitape-3

    …Institute for Aviation Research Wichita State University Wichita, KS 67260-0093 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Fabrication Facility: Gulfstream Aerospace Corporation 500 Gulfstream Rd. Savannah, GA 31408 Distribution Statement A. Approved for public release;…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5320-1/T650-Unitape-3.pdf

  20. PDF

    NCP-RP-2010-002-Rev-NC-MTM45-1-AS4-PW-M-Cure-Equivalency-Statistical-Analysis-Report-3-21-19

    …Date: March 21, 2019 Prepared by: Dr. Elizabeth Clarkson Digitally signed by Dr. Elizabeth Clarkson DN: cn=Dr. Elizabeth Clarkson, o=Wichita State University, ou=NCAMP, email=bclarkson@niar.wichita.edu, c=US Date: 2019.03.21 11:35:55 -05'00' Elizabeth Clarkson Reviewed by: Jonathan Tisack Digitally signed by Jonathan Tisack DN: cn=Jonathan Tisack,…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NCP-RP-2010-002-Rev-NC-MTM45-1-AS4-PW-M-Cure-Equivalency-Statistical-Analysis-Report-3-21-19.pdf

  • First
  • Previous
  • Page 115
  • Page 116
  • Page 117
  • Page 118
  • Page 119
  • Page 120
  • Next
  • Last
WSU logo
1845 Fairmount St.
Wichita, Kansas  67260
USA
(316) 978-3456
Request InfoVisitApply
Contact UsVirtual TourInteractive Map and Directions
WSU Foundation and Alumni Engagement logoShocker Store LogoAge Friendly University logo
FacebookX | TwitterInstagramYouTubeLinkedin
(WSU) is unique in how many excellent opportunities students have to get relevant experience on their resume while in college.
Sarah Varner , aerospace engineering major
Alumni & FriendsGive to WSU
  • A-Z Index
  • Careers and Employment
  • Freedom of Expression
  • Policies and Procedures
  • Privacy Policy
  • Notice of Nondiscrimination
  • Title IX
  • Campus Safety
  • Accessibility
  • Public Information
  • Website Support
  • KBOR Freedom of Expression Statement
  • HLC Accreditation

© 2026 Wichita State University

footer-lbbgogo
Wichita State University (“WSU”) does not discriminate on the basis of sex in its education programs, activities, admissions and employment.