LeadershipInnovation at WSUResearchDirectoriesGive to WSUmyWSUOneStop
ACADEMICSADMISSIONSSTUDENT LIFEATHLETICSABOUTAPPLY NOW
  • Leadership
  • Innovation at WSU
  • Research
  • Directories
  • Give to WSU
  • myWSU
  • OneStop
  • Academic Calendar
  • Apply Now!
  • A-Z Directory
  • Blackboard
  • Campus Events
  • Careers and Employment
  • Office Hours
  • Policies and Procedures
  • Schedule of Courses
  • ShockerSync - Student Events
  • Shocker Store
  • Student Webmail
  • Technology HelpDesk
  • Transfer to WSU
  • University Libraries
Wichita State University LogoWichita State University Logo
ACADEMICSADMISSIONSSTUDENT LIFEATHLETICSABOUTAPPLY NOW

Search Results for “ai”

6,014 results · showing 4721–4740 · 645 ms

Search Results

  1. PDF

    T650-6k-5HS-2

    …Number SP4612WI-Q NCAMP Test Report Number: CAM-RP-2010-056 Rev A July 27, 2012 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Cytec Engineered Materials Inc 1440 N. Kraemer Blvd Anaheim, CA 92806. Page 1 of 247 NATIONAL INSTITUTE FOR…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5215/T650-6k-5HS-2.pdf

  2. PDF

    5215-NCAMP-Material-Base-Specification

    NMS 323 Rev Date: August 14, 2017 Document No.: NMS 323 NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Low Initial Temperature Vacuum-Bag-Only Cure, Modified Epoxy Prepregs (Cytec Cycom 5215) Prepared by: Yeow Ng, John Tomblin, Vinsensius Tanoto Reviewed by: Ric…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5215/5215-NCAMP-Material-Base-Specification.pdf

  3. PDF

    T40-800-Unitape-2

    …Number SP4612WI-Q NCAMP Test Report Number: CAM-RP-2010-048 Rev N/C July 27, 2012 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Cytec Engineered Materials Inc 1440 N. Kraemer Blvd Anaheim, CA 92806. Page 1 of 258 NATIONAL INSTITUTE FOR…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5215/T40-800-Unitape-2.pdf

  4. PDF

    5215-NCAMP-Process-Specification

    …the methods of fabricating test panels using Cycom 5215. Specifically, this specification covers prepreg cutting, layup, vacuum bagging, and curing process with a forced-air convection oven equipped with vacuum ports. This specification does not contain all the necessary information typically required in a composite process specification for the…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5215/5215-NCAMP-Process-Specification.pdf

  5. PDF

    NCP-RP-2010-010-Rev-NC-MTM45-1-3K-PW-G30-500-LH-Cure

    Report No: NCP-RP-2010-010 Rev N/C Report Date: June 22, 2018 Solvay (Formerly Advanced Composites Group) – MTM45-1 CF0526A-36% RW 3K Plain Weave G30-500 Fabric, 193 gsm Equivalency Statistical Analysis Report – LH Cure Cycle FAA Special Project Number: SP3505WI-Q NCAMP Document: NCP-RP-2010-010 N/C Report Date: June 22, 2018 Elizabeth Clarkson, Ph.D.…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NCP-RP-2010-010-Rev-NC-MTM45-1-3K-PW-G30-500-LH-Cure.pdf

  6. PDF

    NPS-81451-Rev-D-September-23-2022

    NPS 81451 Rev D Date: September 23, 2022 Document No.: NPS 81451, Revision D, September 23, 2022 NCAMP Process Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Fabrication of NMS 451 Qualification, Equivalency, and Acceptance Test Panels (Solvay (Formerly Advanced Composites Group…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NPS-81451-Rev-D-September-23-2022.pdf

  7. PDF

    NCP-RP-2010-002-Rev-NC-MTM45-1-AS4-PW-M-Cure-Equivalency-Statistical-Analysis-Report-3-21-19

    …Date: March 21, 2019 Prepared by: Dr. Elizabeth Clarkson Digitally signed by Dr. Elizabeth Clarkson DN: cn=Dr. Elizabeth Clarkson, o=Wichita State University, ou=NCAMP, email=bclarkson@niar.wichita.edu, c=US Date: 2019.03.21 11:35:55 -05'00' Elizabeth Clarkson Reviewed by: Jonathan Tisack Digitally signed by Jonathan Tisack DN: cn=Jonathan Tisack,…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NCP-RP-2010-002-Rev-NC-MTM45-1-AS4-PW-M-Cure-Equivalency-Statistical-Analysis-Report-3-21-19.pdf

  8. PDF

    NCP-RP-2010-001-Rev-NC-MTM45-1-AS4-PW-LH-Cure-Equivalency-Statistical-Analysis-Report-3-21-19

    …Date: March 21, 2019 Prepared by: Dr. Elizabeth Clarkson Digitally signed by Dr. Elizabeth Clarkson DN: cn=Dr. Elizabeth Clarkson, o=Wichita State University, ou=NCAMP, email=bclarkson@niar.wichita.edu, c=US Date: 2019.03.21 11:36:09 -05'00' Elizabeth Clarkson Reviewed by: Jonathan Tisack Digitally signed by Jonathan Tisack DN: cn=Jonathan Tisack,…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NCP-RP-2010-001-Rev-NC-MTM45-1-AS4-PW-LH-Cure-Equivalency-Statistical-Analysis-Report-3-21-19.pdf

  9. PDF

    CAM-RP-2015-038-Rev-NC-TenCate-BT250E-6-IM7-GP-Unitape-MPDR-10.25.2017

    …NCAMP Test Report Number: CAM-RP-2015-038 N/C Report Date: October 25, 2017 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Advanced Technologies Inc. (ATI) 875 Middle Ground Blvd Newport News, VA 23606 Distribution Statement A. Approved…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-bt250e-6/CAM-RP-2015-038-Rev-NC-TenCate-BT250E-6-IM7-GP-Unitape-MPDR-10.25.2017.pdf

  10. PDF

    S2-Glass-Unitape

    NMS 250/3 Rev A Date: May 17, 2018 Document No.: NMS 250/3, Revision A, May 17, 2018 NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Glass Fiber Reinforced Epoxy Resin Prepregs, Type 33, Class 3, Grade 284 (TenCate Advanced Composites BT250E-6 S2 Unidirectional Tape)…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-bt250e-6/S2-Glass-Unitape.pdf

  11. PDF

    BT250E-6-NCAMP-Material-Base-Specification

    NMS 250 Rev Date: October 20, 2017 Document No.: NMS 250, Revision -, October 20, 2017 NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 TenCate BT250E-6 Prepared by: Vinsensius Tanoto (NCAMP), Michelle Man (NCAMP) Reviewed by: Barry Meyers (TenCate), Royal Lovingfoss…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-bt250e-6/BT250E-6-NCAMP-Material-Base-Specification.pdf

  12. PDF

    T650-3k-PW-2

    …NCAMP Test Report Number: CAM-RP-2012-017 Rev NC Report Date: October 13, 2015 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Gulfstream Aerospace Corporation 500 Gulfstream Rd. Savannah Ga. 31408 Distribution Statement A. Approved for…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5320-1/T650-3k-PW-2.pdf

  13. PDF

    T650-3k-PW-3

    …Institute for Aviation Research Wichita State University Wichita, KS 67260-0093 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Gulfstream Aerospace Corporation 500 Gulfstream Road Savannah, GA 31408 Distribution Statement A. Approved for…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5320-1/T650-3k-PW-3.pdf

  14. PDF

    5320-1-NCAMP-Material-Base-Specification

    NMS 532 Rev A Date: May 18, 2015 Document No.: NMS 532, Revision A May 18, 2015 NCAMP Project Number NPN071001 NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Low Initial Temperature Vacuum-Bag-Only Cure, Medium Toughness Epoxy Prepregs (Cytec Cycom 5320-1) Prepared…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5320-1/5320-1-NCAMP-Material-Base-Specification.pdf

  15. PDF

    T650-Unitape-2

    …NCAMP Test Report Number: CAM-RP-2013-002 Rev A Report Date: January 27, 2017 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Gulfstream Aerospace Corporation 500 Gulfstream Rd. Savannah, GA 31408 Distribution Statement A. Approved for…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5320-1/T650-Unitape-2.pdf

  16. PDF

    T650-Unitape-3

    …Institute for Aviation Research Wichita State University Wichita, KS 67260-0093 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Fabrication Facility: Gulfstream Aerospace Corporation 500 Gulfstream Rd. Savannah, GA 31408 Distribution Statement A. Approved for public release;…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5320-1/T650-Unitape-3.pdf

  17. PDF

    TC250-NCAMP-Material-Base-Specification

    …No.: NMS 688, Revision C, November 30, 2016 FAA Special Project# SP4745WI-Q NCAMP Project Number NPN4745WI-Q NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 250ºF Vacuum Cure, Epoxy Prepregs (Tencate TC 250) Prepared by: Yeow Ng, John Tomblin Reviewed by: Barry …

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-tc250/TC250-NCAMP-Material-Base-Specification.pdf

  18. PDF

    12k-HTS40-2

    …NCAMP Test Report Number: CAM-RP-2011-005 Rev A Test Report Date: September 26, 2016 Testing Facility: National Institute for Aviation Research Wichita State University 1845 N. Fairmount Wichita, KS 67260-0093 Test Panel Fabrication Facility: Advanced Composites Technologies 345 Coney Island Dr. Sparks, NV 89431 Page 1 of 254 Report No: CAM-RP-2011-005…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-tc250/12k-HTS40-2.pdf

  19. PDF

    TC250-NCAMP-Process-Specification

    …Meyers (TenCate), Yeow Ng (NCAMP), John Tomblin (NCAMP) Reviewed by: David Ostrodka National Center for Advanced Materials Performance Wichita State University – NIAR 1845 Fairmount Ave., Wichita, KS 67260-0093, USA Page 1 of 12 July 29, 2008 NPS 81688 Rev C Table of Contents 1. SCOPE…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-tc250/TC250-NCAMP-Process-Specification.pdf

  20. PDF

    EP2202-NCAMP-Material-Base-Specification

    NMS 220 Rev Date: January 26, 2012 Document No.: NMS 220, Revision -, January 26, 2012 NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Autoclave Cure, High Toughness and High Open-Hole Compression Epoxy Prepregs (Solvay Cytec Cycom EP 2202) Prepared by: Yeow Ng,…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-ep2202/EP2202-NCAMP-Material-Base-Specification.pdf

  • First
  • Previous
  • Page 235
  • Page 236
  • Page 237
  • Page 238
  • Page 239
  • Page 240
  • Next
  • Last
WSU logo
1845 Fairmount St.
Wichita, Kansas  67260
USA
(316) 978-3456
Request InfoVisitApply
Contact UsVirtual TourInteractive Map and Directions
WSU Foundation and Alumni Engagement logoShocker Store LogoAge Friendly University logo
FacebookX | TwitterInstagramYouTubeLinkedin
(WSU) is unique in how many excellent opportunities students have to get relevant experience on their resume while in college.
Sarah Varner , aerospace engineering major
Alumni & FriendsGive to WSU
  • A-Z Index
  • Careers and Employment
  • Freedom of Expression
  • Policies and Procedures
  • Privacy Policy
  • Notice of Nondiscrimination
  • Title IX
  • Campus Safety
  • Accessibility
  • Public Information
  • Website Support
  • KBOR Freedom of Expression Statement
  • HLC Accreditation

© 2026 Wichita State University

footer-lbbgogo
Wichita State University (“WSU”) does not discriminate on the basis of sex in its education programs, activities, admissions and employment.