LeadershipInnovation at WSUResearchDirectoriesGive to WSUmyWSUOneStop
ACADEMICSADMISSIONSSTUDENT LIFEATHLETICSABOUTAPPLY NOW
  • Leadership
  • Innovation at WSU
  • Research
  • Directories
  • Give to WSU
  • myWSU
  • OneStop
  • Academic Calendar
  • Apply Now!
  • A-Z Directory
  • Blackboard
  • Campus Events
  • Careers and Employment
  • Office Hours
  • Policies and Procedures
  • Schedule of Courses
  • ShockerSync - Student Events
  • Shocker Store
  • Student Webmail
  • Technology HelpDesk
  • Transfer to WSU
  • University Libraries
Wichita State University LogoWichita State University Logo
ACADEMICSADMISSIONSSTUDENT LIFEATHLETICSABOUTAPPLY NOW

Search Results for “design”

8,539 results · showing 5481–5500 · 438 ms

Search Results

  1. PDF

    T_Break_Guide_v5printable

    …pajamas, bath, books, and bed. The whole sequence is designed to tell the body that it is time to sleep. The idea for this format came from the Student Well-Being Center at Notre Dame. Thanks ND. If you are having trouble falling asleep, look at your routine. If you don’t have a bedtime routine, you can make one. Here are a few tips. Wear pajamas. …

    https://www.wichita.edu/services/prevention/_documents/T_Break_Guide_v5printable.pdf

  2. PDF

    Phased_Retirement_Request_Form

    …Unit Director/Dean Approval: Date: VP Approval (if applicable): Date: Provost/Divisional VP Approval: Date: University President Approval: Date: University President or designee: After filling out and signing form, submit to general.counsel@wichita.edu The signatures above indicate this Form has been reviewed by all signing parties, and the…

    https://www.wichita.edu/services/humanresources/Business_Partners/docs/Phased_Retirement_Request_Form.pdf

  3. PDF

    Student_Academic_Information_Release_Authorization_01212025

    …has no expiration date; however, you may revoke your authorization at any time by completing Section D below in the presence of a notary public. NOTE: For the third party designee you name on this form, this release overrides all FERPA directory suppression information that you have set up in your student academic record. However, it is University…

    https://www.wichita.edu/services/registrar/forms/Student_Academic_Information_Release_Authorization_01212025.pdf

  4. PDF

    timothy-babb-resume

    …for Animation  Developed Curriculum and Taught Introduction to Computer Animation Program Projection Designer – Music Theatre of Wichita (June, 2015 -As Needed) 3D Programs:  3D Character and Environment Look Development  3D Character Rigging and Animation Houdini  3D modeling, texturing, UV Layout, shading, lighting and rendering Maya  …

    https://www.wichita.edu/profiles/academics/fine_arts/Media_Arts/Assets/timothy-babb-resume.pdf

  5. PDF

    UAS-TERMS-AND-CONDITIONS

    …from an affiliated corporation or a third party; and any other property controlled by the WSU. University Premises may change from time to time, but they are designated annually in WSU’s Annual Security Report and on the Clery web page. 1.6 “University UAS Policy” means Policy 11.03 / Unmanned Aircraft Systems, available at…

    https://www.wichita.edu/administration/generalcounsel/_documents/UAS-TERMS-AND-CONDITIONS.pdf

  6. PDF

    5250-5-NCAMP-Process-Specification

    …Cure Cycle (C) The baseline cure cycle shall be in accordance with the following process. For the purpose of specimen naming, this cure cycle is designated as “C.” The material qualification panels are processed in accordance with the baseline cure cycle. Check vacuum bag integrity prior to starting cure cycle; leak rate shall not exceed 1 in.Hg in 2…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5250-5/5250-5-NCAMP-Process-Specification.pdf

  7. PDF

    5215-NCAMP-Process-Specification

    …cure cycle shall be in accordance with the following process. and Figure 4. For the purpose of specimen naming, this cure cycle is designated as “C.” The material qualification panels are processed in accordance with the baseline cure cycle. Check Page 8 of 10 July 16, 2007 NPS 81323 Rev A vacuum bag integrity prior to starting cure cycle; leak rate…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5215/5215-NCAMP-Process-Specification.pdf

  8. PDF

    NMS-451-slash-6-Rev-A-April-22-2024-Solvay-MTM45-1-IM7-Unitape

    …• Formatting. Cover Page: • Clay Scoggins (Solvay) was added as reviewer. Revision Table: • Revision Table was added. QUALIFIED PRODUCTS LIST: • Supplier Product Designation name was revised from “MTM45-1/IM7-145-32%RW” to “MTM45-1-32%12KIM7GP-145-610 (Formerly MTM45-1/IM7-14532%RW)”. • Supplier Name additional information was added, “Cytec…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NMS-451-slash-6-Rev-A-April-22-2024-Solvay-MTM45-1-IM7-Unitape.pdf

  9. PDF

    3K-PW-G30-500-Fabric-3

    …of variation method is also provided. The material property data acquisition process is designed to generate basic material property data with sufficient pedigree for submission to Complete Documentation sections of the Composite Materials Handbook (CMH-17 Rev G). The NCAMP shared material property database contains material property data of common…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/3K-PW-G30-500-Fabric-3.pdf

  10. PDF

    CAM-RP-2015-039-Rev-NC-TenCate-BT250E-6-AS4C-PW-MPDR-10.24.2017

    …Project Number TD03019RC-R, and also meet the requirements of NCAMP Standard Operating Procedure NSP100; the test panels and test specimens have been inspected by an FAA Designated Airworthiness Representative (DAR) and the testing has been witnessed by an FAA Designated Engineering Representative (DER). However, the data may not fulfill all the needs of…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-bt250e-6/CAM-RP-2015-039-Rev-NC-TenCate-BT250E-6-AS4C-PW-MPDR-10.24.2017.pdf

  11. PDF

    CAM-RP-2015-038-Rev-NC-TenCate-BT250E-6-IM7-GP-Unitape-MPDR-10.25.2017

    …TD03019RC-R, and also meet the requirements of NCAMP Standard Operating Procedure NSP 100; the test panels and test specimens have been inspected by an FAA Designated Airworthiness Representative (DAR) and the testing has been witnessed by an FAA Designated Engineering Representative (DER). However, the data may not fulfill all the needs of any specific …

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-bt250e-6/CAM-RP-2015-038-Rev-NC-TenCate-BT250E-6-IM7-GP-Unitape-MPDR-10.25.2017.pdf

  12. PDF

    TenCate-BT250E-6-S2-Unitape-284-gsm-33-RC-Qualification-Material-Property-Data-Report

    …TD03019RC-R, and also meet the requirements of NCAMP Standard Operating Procedure NSP 100; the test panels and test specimens have been inspected by an FAA Designated Airworthiness Representative (DAR) and the testing has been witnessed by an FAA Designated Engineering Representative (DER). However, the data may not fulfill all the needs of any specific …

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-bt250e-6/TenCate-BT250E-6-S2-Unitape-284-gsm-33-RC-Qualification-Material-Property-Data-Report.pdf

  13. PDF

    TC250-NCAMP-Process-Specification

    …fiber orientation. Note that the caul sheet is smaller than the layup with approximately ½ to 1-inch of the lay-up exposed on four edges, designed to eliminate thickness taper at the panel edges. The required panel sizes refer to the size of the caul sheet. Cork, silicone or any other type of stiff dam may be used as long as there are 3 – 4 glass breather…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-tc250/TC250-NCAMP-Process-Specification.pdf

  14. PDF

    EP2202-NCAMP-Process-Specification

    …(C) The baseline cure cycle shall be in accordance with the following process. For the purpose of specimen naming, this cure cycle is designated as “C.” The material qualification panels are processed in accordance with the baseline cure cycle. Check vacuum bag integrity prior to starting cure cycle; leak rate shall not exceed 1” of Hg in 5 minutes. All …

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-ep2202/EP2202-NCAMP-Process-Specification.pdf

  15. PDF

    NCT4708-NCAMP-Process-Specification

    …cycle shall be in accordance with the following process. For the purpose of specimen naming, this cure cycle is designated as “C.” The material qualification panels are processed in accordance with the baseline cure cycle. Check vacuum bag integrity prior to starting cure cycle; leak rate shall not exceed 1” Hg in 2 minutes. All temperatures are part…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/newport-nct4708/NCT4708-NCAMP-Process-Specification.pdf

  16. PDF

    NMS-818-22RevNC2012-12-5

    …is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Carbon Fiber Tow, 543 Tensile Strength, 34.5 Tensile Modulus (Supplier Product Designation: Tenax-E HTA40 E13 3K 200tex) Prepared by: Yeow Ng, John Tomblin Reviewed by: Michael Wheeler (Diamond Aircraft), Mike Kinsella (Toho Tenax), Joe Spangler (Toho Tenax) …

    https://www.wichita.edu/industry_and_defense/NIAR/Research/nms818/NMS-818-22RevNC2012-12-5.pdf

  17. PDF

    NPS-83961AFP-Rev-D-March-7-2025

    … process (Figure 6.2). For the purpose of specimen naming, this cure cycle is designated as “C.” The material qualification panels are processed in accordance with the baseline cure cycle. Check each vacuum bag assembly for leak before beginning the cure cycle per 6.8. All temperatures are panel temperatures based on the lagging thermocouple. The vacuum and …

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NPS-83961AFP-Rev-D-March-7-2025.pdf

  18. PDF

    NPS-84013-Rev-B-02-1-2023

    …consolidation cycle shall be in accordance with the following process. For the purpose of specimen naming, this consolidation cycle is designated as “M” The material qualification panels are processed in accordance with this consolidation cycle through a series of 3 inline presses. All temperatures are panel temperatures based on the lagging…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NPS-84013-Rev-B-02-1-2023.pdf

  19. PDF

    NMS-818-RevA-slash-15_IMS65-24K-2-27-2023

    …NCAMP Material Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Carbon Fiber Tow (Supplier Product Designation: Tenax-E IMS65 E23 24K) E-Europe Prepared by: Joe Spangler (Teijin Carbon America), Michelle Man (NIAR) Reviewed by: Mike Kinsella (Teijin Carbon America), Royal…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NMS-818-RevA-slash-15_IMS65-24K-2-27-2023.pdf

  20. PDF

    NMS-451-slash-11-Rev-B-Nov-8-2023-Solvay-MTM45-1-AS4-Unitape

    … Standard width was revised to 24”, 50” was a typo. Tulsa, OK produced the material to 12” wide. QUALIFIED PRODUCTS LIST: • Supplier Product Designation name was revised from “Formerly MTM45-1/AS4-145-32%RW” to “MTM451-32%-12KAS4GP-145-610 (Formerly MTM451/AS4-145-32%RW)”. • Supplier Name additional information was added, “Cytec Engineered Materials Inc.”…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NMS-451-slash-11-Rev-B-Nov-8-2023-Solvay-MTM45-1-AS4-Unitape.pdf

  • First
  • Previous
  • Page 273
  • Page 274
  • Page 275
  • Page 276
  • Page 277
  • Page 278
  • Next
  • Last
WSU logo
1845 Fairmount St.
Wichita, Kansas  67260
USA
(316) 978-3456
Request InfoVisitApply
Contact UsVirtual TourInteractive Map and Directions
WSU Foundation and Alumni Engagement logoShocker Store LogoAge Friendly University logo
FacebookX | TwitterInstagramYouTubeLinkedin
(WSU) is unique in how many excellent opportunities students have to get relevant experience on their resume while in college.
Sarah Varner , aerospace engineering major
Alumni & FriendsGive to WSU
  • A-Z Index
  • Careers and Employment
  • Freedom of Expression
  • Policies and Procedures
  • Privacy Policy
  • Notice of Nondiscrimination
  • Title IX
  • Campus Safety
  • Accessibility
  • Public Information
  • Website Support
  • KBOR Freedom of Expression Statement
  • HLC Accreditation

© 2026 Wichita State University

footer-lbbgogo
Wichita State University (“WSU”) does not discriminate on the basis of sex in its education programs, activities, admissions and employment.