LeadershipInnovation at WSUResearchDirectoriesGive to WSUmyWSUOneStop
ACADEMICSADMISSIONSSTUDENT LIFEATHLETICSABOUTAPPLY NOW
  • Leadership
  • Innovation at WSU
  • Research
  • Directories
  • Give to WSU
  • myWSU
  • OneStop
  • Academic Calendar
  • Apply Now!
  • A-Z Directory
  • Blackboard
  • Campus Events
  • Careers and Employment
  • Office Hours
  • Policies and Procedures
  • Schedule of Courses
  • ShockerSync - Student Events
  • Shocker Store
  • Student Webmail
  • Technology HelpDesk
  • Transfer to WSU
  • University Libraries
Wichita State University LogoWichita State University Logo
ACADEMICSADMISSIONSSTUDENT LIFEATHLETICSABOUTAPPLY NOW

Search Results for “engineering management”

1,589 results · showing 1561–1580 · 237 ms

Search Results

  1. PDF

    NCP-RP-2008-009-Rev-NC-MTM45-1-AS4-145-M-Cure-Cycle

    …section 8.4.1. The modified coefficient of variation (Mod CV) comparison tests were done in accordance with section 8.4.4 of CMH-17-1G. Engineering basis values were reported in NCAMP Report NCP-RP-2008-004 Rev N/C which details the standards and methodology used for computing basis values as well as providing the B-basis values and A- and B- estimates…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NCP-RP-2008-009-Rev-NC-MTM45-1-AS4-145-M-Cure-Cycle.pdf

  2. PDF

    NCP-RP-2019-001RevNCMTM45-1AS4-145LHCureCycle

    …section 8.4.1. The modified coefficient of variation (Mod CV) comparison tests were done in accordance with section 8.4.4 of CMH-17-1G. Engineering basis values were reported in NCAMP Report NCP-RP-2008-004 Rev N/C which details the standards and methodology used for computing basis values as well as providing the B-basis values and A- and B- estimates…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NCP-RP-2019-001RevNCMTM45-1AS4-145LHCureCycle.pdf

  3. PDF

    CAM-RP-2015-039-Rev-NC-TenCate-BT250E-6-AS4C-PW-MPDR-10.24.2017

    …the test panels and test specimens have been inspected by an FAA Designated Airworthiness Representative (DAR) and the testing has been witnessed by an FAA Designated Engineering Representative (DER). However, the data may not fulfill all the needs of any specific company's program; specific properties, environments, laminate architecture, and loading…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-bt250e-6/CAM-RP-2015-039-Rev-NC-TenCate-BT250E-6-AS4C-PW-MPDR-10.24.2017.pdf

  4. PDF

    TenCate-BT250E-6-S2-Unitape-284-gsm-33-RC-Qualification-Material-Property-Data-Report

    …panels and test specimens have been inspected by an FAA Designated Airworthiness Representative (DAR) and the testing has been witnessed by an FAA Designated Engineering Representative (DER). However, the data may not fulfill all the needs of any specific company's program; specific properties, environments, laminate architecture, and loading situations…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-bt250e-6/TenCate-BT250E-6-S2-Unitape-284-gsm-33-RC-Qualification-Material-Property-Data-Report.pdf

  5. PDF

    CAM-RP-2015-038-Rev-NC-TenCate-BT250E-6-IM7-GP-Unitape-MPDR-10.25.2017

    …panels and test specimens have been inspected by an FAA Designated Airworthiness Representative (DAR) and the testing has been witnessed by an FAA Designated Engineering Representative (DER). However, the data may not fulfill all the needs of any specific company's program; specific properties, environments, laminate architecture, and loading situations…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/tencate-bt250e-6/CAM-RP-2015-038-Rev-NC-TenCate-BT250E-6-IM7-GP-Unitape-MPDR-10.25.2017.pdf

  6. PDF

    CAM-RP-2010-003-NC-Final-Report-ACG_Equivalency_Fabric_LH-M-Cure-Cycle-Rev-A

    …not limited to, performing regular purchaser quality control tests, performing periodic equivalency/additional testing, participating in material change management activities, conducting statistical process control, and conducting regular supplier audits. 6 CAM-RP-2010-003 N/C, March 9, 2011 Revision A The applicability of NCAMP material property…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/CAM-RP-2010-003-NC-Final-Report-ACG_Equivalency_Fabric_LH-M-Cure-Cycle-Rev-A.pdf

  7. PDF

    12K-HTS5631-Unidirectional-HTS40-2

    …including, but not limited to, performing regular purchaser quality control tests, performing periodic equivalency/additional testing, participating in material change management activities, conducting statistical process control, and conducting regular supplier audits. The applicability of NCAMP material property data, material allowables, and…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/12K-HTS5631-Unidirectional-HTS40-2.pdf

  8. PDF

    NSP120BylawsMABDecember222009

    …known as Company Appointed MAB Member, to receive and submit the ballot on behalf of the companies. Company Appointed MAB Member are appointed by the individual company managements, usually the vice-president of engineering, to be the official point-of-contact with NCAMP. Section 3. Waiver Procedures When it is in the best interest of NCAMP members,…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NCAMP/NSP120BylawsMABDecember222009.pdf

  9. PDF

    Renegade-8HS-Quartz-fabric-CAM-RP-2024-007-Rev-A-10.8.25-MPDR

    …properties, environments, laminate architecture, and loading situations may require additional testing. The use of NCAMP material and process specifications does not guarantee material or structural performance. Material users should be actively involved in evaluating material performance and quality including, but not limited to, performing regular…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/Renegade-8HS-Quartz-fabric-CAM-RP-2024-007-Rev-A-10.8.25-MPDR.pdf

  10. PDF

    Toray-3960-Uni-CAM-RP-2024-004-Rev-A-9.4.25-MPDR-DRAFT

    …additional testing. The use of NCAMP material and process specifications do not guarantee material or structural performance. Material users should be actively involved in evaluating material performance and quality including, but not limited to, performing regular purchaser quality control tests, performing periodic equivalency/additional testing,…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/Toray-3960-Uni-CAM-RP-2024-004-Rev-A-9.4.25-MPDR-DRAFT.pdf

  11. PDF

    Spirit-CAM-RP-2019-057_Hexcel-8552S-8HS-Fabric_Rev-7-16-25

    …the needs of any specific company's program; specific properties, environments, laminate architecture, and loading situations may require additional testing. The use of NCAMP material and process specifications does not guarantee material or structural performance. Material users should be actively involved in evaluating material performance and quality…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NCAMP/Spirit-CAM-RP-2019-057_Hexcel-8552S-8HS-Fabric_Rev-7-16-25.pdf

  12. PDF

    Victrex-LMPAEK-AS7-UDT-CAM-RP-2025-009-Rev-9.15.25

    …properties, environments, laminate architecture, and loading situations may require additional testing. The use of NCAMP material and process specifications does not guarantee material or structural performance. Material users should be actively involved in evaluating material performance and quality including, but not limited to, performing regular…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NCAMP/Victrex-LMPAEK-AS7-UDT-CAM-RP-2025-009-Rev-9.15.25.pdf

  13. PDF

    EP2190-IMS65-UNI-CAM-RP-2022-001-Rev-9.18.2025-MPDR

    …properties, environments, laminate architecture, and loading situations may require additional testing. The use of NCAMP material and process specifications do not guarantee material or structural performance. Material users should be actively involved in evaluating material performance and quality including, but not limited to, performing regular…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/EP2190-IMS65-UNI-CAM-RP-2022-001-Rev-9.18.2025-MPDR.pdf

  14. PDF

    EP2190-T650-3KPW-Fabric-CAM-RP-2022-002-Rev-9-18-2025-MPDR

    …properties, environments, laminate architecture, and loading situations may require additional testing. The use of NCAMP material and process specifications does not guarantee material or structural performance. Material users should be actively involved in evaluating material performance and quality including, but not limited to, performing regular…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/EP2190-T650-3KPW-Fabric-CAM-RP-2022-002-Rev-9-18-2025-MPDR.pdf

  15. PDF

    Tenax-E-TPCL-PEEK-HTA40-E13-3K-5HS-CAM-RP-2019-007-MPDR03-08--Final

    …laminate architecture, and loading situations may require additional testing. The use of NCAMP material and process specifications does not guarantee material or structural performance. Material users should be actively involved in evaluating material performance and quality including, but not limited to, performing regular purchaser quality control…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/Tenax-E-TPCL-PEEK-HTA40-E13-3K-5HS-CAM-RP-2019-007-MPDR03-08--Final.pdf

  16. PDF

    CAM-RP-2023-007-NC-Additively-Manufactured-Hexpekk-100

    …NSP 100; the test specimens have been inspected by NCAMP Authorized Inspection Representatives (AIR) and the testing has been witnessed by NCAMP Authorized Engineering Representatives (AER). However, the data may not fulfill all the needs of any specific company's program; specific properties, environments, build orientation, and loading situations …

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/CAM-RP-2023-007-NC-Additively-Manufactured-Hexpekk-100.pdf

  17. PDF

    ACG-IM7-Uni-CAM-RP-2008-007-Rev-C-2.12.2024-MPDR-FINAL

    …data, material allowables, and specifications must be evaluated on case-by-case basis by aircraft companies and certifying agencies. NCAMP assumes no liability whatsoever, expressed or implied, related to the use of the material property data, material allowables, and specifications. Statistical analysis of the data including the calculations of…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/ACG-IM7-Uni-CAM-RP-2008-007-Rev-C-2.12.2024-MPDR-FINAL.pdf

  18. PDF

    Syensqo_EP2400_and_Teijin_NCF-CAM-RP-2024-020_Rev-11.05.2025

    …by NCAMP Authorized Inspection Representatives (AIR) and the testing has been witnessed by NCAMP Authorized Engineering Representatives (AER). However, the data may not fulfill all the needs of any specific company's program; specific properties, environments, laminate architecture, and loading situations may require additional testing. The use of NCAMP…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NCAMP/Syensqo_EP2400_and_Teijin_NCF-CAM-RP-2024-020_Rev-11.05.2025.pdf

  19. PDF

    3K-PW-G30-500-Fabric-2

    …but not limited to, performing regular purchaser quality control tests, performing periodic equivalency/additional testing, participating in material change management activities, conducting statistical process control, and conducting regular supplier audits. The applicability of NCAMP material property data, material allowables, and specifications must…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/3K-PW-G30-500-Fabric-2.pdf

  20. PDF

    T650-3k-70-PW-2

    …program; specific properties, environments, laminate architecture, and loading situations may require additional testing. The use of NCAMP material and process specifications does not guarantee material or structural performance. Material users should be actively involved in evaluating material performance and quality including, but not limited to,…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-ep2202/T650-3k-70-PW-2.pdf

  • First
  • Previous
  • Page 75
  • Page 76
  • Page 77
  • Page 78
  • Page 79
  • Page 80
  • Next
  • Last
WSU logo
1845 Fairmount St.
Wichita, Kansas  67260
USA
(316) 978-3456
Request InfoVisitApply
Contact UsVirtual TourInteractive Map and Directions
WSU Foundation and Alumni Engagement logoShocker Store LogoAge Friendly University logo
FacebookX | TwitterInstagramYouTubeLinkedin
(WSU) is unique in how many excellent opportunities students have to get relevant experience on their resume while in college.
Sarah Varner , aerospace engineering major
Alumni & FriendsGive to WSU
  • A-Z Index
  • Careers and Employment
  • Freedom of Expression
  • Policies and Procedures
  • Privacy Policy
  • Notice of Nondiscrimination
  • Title IX
  • Campus Safety
  • Accessibility
  • Public Information
  • Website Support
  • KBOR Freedom of Expression Statement
  • HLC Accreditation

© 2026 Wichita State University

footer-lbbgogo
Wichita State University (“WSU”) does not discriminate on the basis of sex in its education programs, activities, admissions and employment.