LeadershipInnovation at WSUResearchDirectoriesGive to WSUmyWSUOneStop
ACADEMICSADMISSIONSSTUDENT LIFEATHLETICSABOUTAPPLY NOW
  • Leadership
  • Innovation at WSU
  • Research
  • Directories
  • Give to WSU
  • myWSU
  • OneStop
  • Academic Calendar
  • Apply Now!
  • A-Z Directory
  • Blackboard
  • Campus Events
  • Careers and Employment
  • Office Hours
  • Policies and Procedures
  • Schedule of Courses
  • ShockerSync - Student Events
  • Shocker Store
  • Student Webmail
  • Technology HelpDesk
  • Transfer to WSU
  • University Libraries
Wichita State University LogoWichita State University Logo
ACADEMICSADMISSIONSSTUDENT LIFEATHLETICSABOUTAPPLY NOW

Search Results for “applied engineering”

3,033 results · showing 2941–2960 · 254 ms

Search Results

  1. PDF

    NCP-RP-2009-002-Rev-NC-IM7-LH-cure-cycle-Equivalence-Report-3-21-19

    …data is available in “MTM45-1 IM7-145 LH Cure Cycle Values 2-6-08.pdf”. Engineering basis values were reported in NCAMP Report NCPRP-2008-006 Rev A, which details the standards and methodology used for computing basis values as well as providing the B-basis values and A- and B- estimates computed from the test results for the original qualification…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NCP-RP-2009-002-Rev-NC-IM7-LH-cure-cycle-Equivalence-Report-3-21-19.pdf

  2. PDF

    RC-Dec2010

    …in an upcoming edition of Journal of Applied Psychology. For more information on this research, contact: Dr. Steven Farmer at Steven.Farmer@wichita.edu Dr. Steve Farmer, W. Frank Barton Distinguished Chair in Business, holds a PhD from the Georgia Institute of Technology. In the classroom, Dr. Farmer can be found teaching courses in business…

    https://www.wichita.edu/academics/business/research-connection/_documents/RC-Dec2010.pdf

  3. PDF

    NCP-RP-2023-005-Rev-NC-HexPEKK-Statistical-Analysis-Report

    …Operating Procedures; the test specimens have been inspected by NCAMP Authorized Inspection Representatives (AIR) and the testing has been witnessed by NCAMP Authorized Engineering Representatives (AER). However, the data may not fulfill all the needs of any specific company's program; specific properties, environments, laminate architecture, and…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NCP-RP-2023-005-Rev-NC-HexPEKK-Statistical-Analysis-Report.pdf

  4. PDF

    MemoNCAMPsigned

    …Aviation Administration Memorandum Date: SEP ·2.0 2010 To: All Directorate Managers All Aircraft Certification Office Managers From: David W. Hempe, Manager, Aircraft Engineering Division, AIR-100 Prepared By: Mark Freisthler, Aerospace Engineer, Transport Airplane Directorate, (ANM- 115) Supported By: Robert Stegeman (ACE-111 ), Dale Hawkins…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NCAMP/MemoNCAMPsigned.pdf

  5. PDF

    Toray-TC380-T1100GC-24K-Uni-NCP-RP-2025-010-Rev-10-03-25-SAR

    …and the testing has been witnessed by NCAMP Authorized Engineering Representatives (AER). B-Basis values, A-estimates, and B-estimates were calculated using a variety of techniques that are detailed in section 2. The qualification material was procured to NCAMP Material Specification NMS 380/1 Rev – dated May 2, 2024. The qualification test panels were…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/Toray-TC380-T1100GC-24K-Uni-NCP-RP-2025-010-Rev-10-03-25-SAR.pdf

  6. PDF

    FamilyNewsletterMarch24

    …Second Week of April- New Student applicants begin their room selection based on their complete date Fourth Week of April- Open room selection begins for all students who have applied later or have not received a timeslot at this point It’s Time to Schedule and Academic Advising Appointment Enrollment for fall 2024 begins April 1, 2024! Classes tend to…

    https://www.wichita.edu/services/shockerfamily/_images/FamilyNewsletterMarch24.pdf

  7. PDF

    JAMS-Intro-SAMPE-05212024-v4

    …(1) CONTINUED OPERATIONS.—The Administrator shall continue operation of the Advanced Materials Center of Excellence. (2) PURPOSES.—The Center shall— (A) focus on applied research and training on the safe use of composites and advanced materials, and related manufacturing practices, in airframe structures; and (B) conduct research and development…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/JAMS-Intro-SAMPE-05212024-v4.pdf

  8. PDF

    Style-6781-S2-Glass-2

    …specimen/fastener/fixture with no gap, additional 10-15 in-lbs was applied for a total of 25-30 in-lbs. For filled hole compression tests the fasteners were installed as above then torque released approximately one-quarter (1/4) turn to maintain fastener “flushness” and approximate zero (0) torque allowing the fastener to turn/twist with no lateral movement …

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/Style-6781-S2-Glass-2.pdf

  9. PDF

    Toray-3960-UNI-NCP-RP-2024-004-Rev-A-SAR-09.18.25

    …(AIR) and the testing has been witnessed by NCAMP Authorized Engineering Representative (AER). B-Basis values, A-estimates, and B-estimates were calculated using a variety of techniques that are detailed in section two. The qualification material was procured to NCAMP Material Specification NMS 397/1 Form 1 Revision A dated March 3, 2025. The…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/Toray-3960-UNI-NCP-RP-2024-004-Rev-A-SAR-09.18.25.pdf

  10. PDF

    NCP-RP-2008-008-Rev-NC-IM7-M-cure-Equivalence-Report-3-21-19

    … published in CAM-RP-2008007 Rev B. The equivalency data is available in “MTM45-1 IM7-145 M Cure Cycle Values 2-1-08.pdf”. Engineering basis values were reported in NCAMP Report NCPRP-2008-006 Rev A, which details the standards and methodology used for computing basis values as well as providing the B-basis values and A- and B- estimates computed from the…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NCP-RP-2008-008-Rev-NC-IM7-M-cure-Equivalence-Report-3-21-19.pdf

  11. PDF

    Stratasys_AnteroR_840CN03_NCP-RP-2025-018_Rev_FINAL_SAR_2.27.26

    … been inspected by NCAMP Authorized Inspection Representatives (AIR) and the testing has been witnessed by NCAMP Authorized Engineering Representatives (AER). B-Basis values, A-estimates, and B-estimates were calculated using a variety of techniques that are detailed in section 2. The qualification material was procured to NCAMP Material Specification NMS…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NCAMP/Stratasys_AnteroR_840CN03_NCP-RP-2025-018_Rev_FINAL_SAR_2.27.26.pdf

  12. PDF

    AS4-Unitape-3

    …was not advisable because the data was not eligible for pooling and engineering judgment indicated there was no justification for overriding the result, then B-Basis values were computed for each environmental condition separately using Stat17 version 5. 1.3 Basis Value Computational Process The general form to compute engineering basis values is: basis …

    https://www.wichita.edu/industry_and_defense/NIAR/Research/hexcel-8552/AS4-Unitape-3.pdf

  13. PDF

    T650-3k-PW-3

    …was not advisable because the data was not eligible for pooling and engineering judgment indicated there was no justification for overriding the result, then B-Basis values were computed for each environmental condition separately using Stat-17 version 5. 1.3 Basis Value Computational Process The general form to compute engineering basis values…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-5215/T650-3k-PW-3.pdf

  14. PDF

    spring-2021-red-sheet

    …Engineering, Liberal Arts & Sciences, & Honors Vaughn Sweet | 316-978-2017 Serves Fine Arts, Business, Health Professions & Applied Studies Tip: Offering the name of someone from the resource can help the student to feel more comfortable when they reach out. Tara Hanna | 316-978-3712 Serves on-campus housing Alicia Newell | 316-978-6105 CARE Team…

    https://www.wichita.edu/services/careteam/assets/docs/spring-2021-red-sheet.pdf

  15. PDF

    945_Wednesday_Seaton

    …and quality controls needed for bolted composite repairs ¾ Realize need for more training to acquire technician, inspector or engineering skills (avoid working beyond skill limits) Edmonds Community College The Joint Advanced Materials and Structures Center of Excellence 4 Objectives • Develop awareness course through industry consensus for a…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/945_Wednesday_Seaton.pdf

  16. PDF

    2023-2024McNairJournal_FinalPrint

    …& Statistics Estimating the Ultra-High Energy Neutrino Flux from the Accretion Disks in the Galactic Core at Earth 17 Ashley Bland Bobby Berry, College of Applied Studies From Last to First: Elevating the FirstGeneration Student Experience 21 Robbyn McKellop Crystal Dozier, Anthropology Department Assessment of the Boxed Springs (41UR30) Ceramic…

    https://www.wichita.edu/_archive/services/mcnair/Journals/2023-2024McNairJournal_FinalPrint.pdf

  17. PDF

    NCAMP-Repair-stats-report-NCP-RP-2020-010-RevNC-2-8-2021

    …Procedures; the test panels and test specimens have been inspected by NCAMP Authorized Inspection Representatives (AIR) and the testing has been witnessed by NCAMP Authorized Engineering Representatives (AER). However, the data may not fulfill all the needs of any specific company's program; specific properties, environments, laminate architecture, and…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/NCAMP-Repair-stats-report-NCP-RP-2020-010-RevNC-2-8-2021.pdf

  18. PDF

    NCP-RP-2008-009-Rev-NC-MTM45-1-AS4-145-M-Cure-Cycle

    …section 8.4.1. The modified coefficient of variation (Mod CV) comparison tests were done in accordance with section 8.4.4 of CMH-17-1G. Engineering basis values were reported in NCAMP Report NCP-RP-2008-004 Rev N/C which details the standards and methodology used for computing basis values as well as providing the B-basis values and A- and B- estimates…

    https://www.wichita.edu/industry_and_defense/NIAR/Research/cytec-mtm45-1/NCP-RP-2008-009-Rev-NC-MTM45-1-AS4-145-M-Cure-Cycle.pdf

  19. PDF

    930_Tuesday_Adams

    SHEAR CHARACTERIZATION OF COMPOSITE LAMINATES AND ADHESIVES Jeff Kessler Dan Adams Department of Mechanical Engineering University of Utah Salt Lake City, UT The Joint Advanced Materials and Structures Center of Excellence FAA Sponsored Project Information • P.I. - Dr. Dan Adams • Graduate Student Researchers: – – – – Mike Moriarty Adam Gallegos Matt…

    https://www.wichita.edu/industry_and_defense/NIAR/Documents/930_Tuesday_Adams.pdf

  20. PDF

    afr_11

    …Fiscal Year 2011 Annual GASB Financial Report Management’s Discussion and Analysis • Engineering Building: The building’s HVAC system was replaced. The project cost of $1.25 million was paid by $1.1 million from deferred maintenance funds, $145 thousand from infrastructure maintenance funds, and $6 thousand from repair and rehabilitation funds. • …

    https://www.wichita.edu/_archive/services/controller/Accounting/_documents/afr_11.pdf

  • First
  • Previous
  • Page 146
  • Page 147
  • Page 148
  • Page 149
  • Page 150
  • Page 151
  • Next
  • Last
WSU logo
1845 Fairmount St.
Wichita, Kansas  67260
USA
(316) 978-3456
Request InfoVisitApply
Contact UsVirtual TourInteractive Map and Directions
WSU Foundation and Alumni Engagement logoShocker Store LogoAge Friendly University logo
FacebookX | TwitterInstagramYouTubeLinkedin
(WSU) is unique in how many excellent opportunities students have to get relevant experience on their resume while in college.
Sarah Varner , aerospace engineering major
Alumni & FriendsGive to WSU
  • A-Z Index
  • Careers and Employment
  • Freedom of Expression
  • Policies and Procedures
  • Privacy Policy
  • Notice of Nondiscrimination
  • Title IX
  • Campus Safety
  • Accessibility
  • Public Information
  • Website Support
  • KBOR Freedom of Expression Statement
  • HLC Accreditation

© 2026 Wichita State University

footer-lbbgogo
Wichita State University (“WSU”) does not discriminate on the basis of sex in its education programs, activities, admissions and employment.