PDF
NMS 201 Rev A
Date: August 7, 2024
Document No.: NMS 201, Revision A, August 7, 2024
NCAMP Material Specification
This specification is generated and maintained in accordance with NCAMP
Standard Operating Procedures, NSP 100
Autoclave Cure, Low Dielectric Epoxy Prepreg
(Renegade RM-2014-LDk-Tk)
Prepared by: Errick Robles (NIAR), Vinsensius Tanoto (NCAMP), …
https://www.wichita.edu/industry_and_defense/NIAR/Documents/NMS-201-Base-Material-Spec-2024-08-7.pdf